DUNMORE — The following work is scheduled for this week throughout Northeastern Pennsylvania.  Anyone wishing to sign up for PennDOT Travel Advisories can do so by emailing James May at jamay@pa.gov.

Follow/like PennDOT on Twitter at 511PANortheast and Facebook at Pennsylvania Department of Transportation (PennDOT).

Please note all work depends on weather conditions.

Please follow PennDOT on Twitter at 511PANortheast and Like us on facebook at Pennsylvania Department of Transportation (PennDOT).

Lackawanna County

Scranton Half Marathon on Sunday, April 8 starting at 8 a.m. to 3 p.m. The marathon to being and end at Scranton School District Memorial Stadium winding through selected Scranton streets.  Streets that will be effected are:  Providence Road, Green Ridge Street, N Washington Ave-Adams Avenue, Spruce Street-Cedar Avenue, Lackawanna Avenue and N Main Avenue.

Short Term

SR 1025-Wemberly Road-Scott Twp.-Single-Pipe Replacement-Inlet/Endwall Repair-9-Apr-18-13-Apr-18-7 a.m.to 3 p.m.

SR 2005-Aberdeen Rd.-Madison Twp.-Single Lane-Ditching-Monday 04/09/2018-Friday 04/13/2018-7 a.m. to 2 p.m.

SR 4002-Baylor's Lake-Benton Twp.-Single-Pipe Trench patch-9-Apr-18-9-Apr-18-7 a.m.to 3 p.m.

SR 6006-Bus. Route 6-Scranton, Dickson city , Blakely, Carbondale-Single-Sweeping-9-Apr-18-13-Apr-18-7 a.m.to 3 p.m.

Long Term

SR 1012, Archbald Borough- At the intersection of Kennedy Drive and County Road, work is taking place to form a four-way intersection with the opposite Borough street. A new traffic signal will be installed at this intersection as well, and Kennedy Drive will be widened to accommodate a center turn lane from Main Street to Monica Drive. An additional left turn lane may be added on Main for left turns on to Kennedy Drive. The project should be completed by the summer of 2018.

Bridge Now Open to traffic . SR 6011(Harrison Avenue), Scranton - As part of the ongoing project to replace the Harrison Avenue Bridge, the Central Scranton Expressway is a single lane pattern in each direction.  The project completion is 2018.