Dunmore – The following work is scheduled for this week throughout Northeastern Pennsylvania.  Anyone wishing to sign up for PennDOT Travel Advisories can do so by emailing James May at jamay@pa.gov

Follow/like PennDOT on Twitter at 511PANortheast and Facebook at Pennsylvania Department of Transportation (PennDOT).

Please note all work depends on weather conditions.

Lackawanna County

Short Term 

The paving project will continue on SR 307. The location from Moosic St in Scranton to SR 307 just pass Lake Scranton. The project should be completed by August 30.

SR 307-Moosic St.-City of Scranton-Single Lane-Bridge Substructure repairs-Monday 08/21/2017-Tuesday 08/22/2017-7 a.m. to 2 p.m.

SR 435-S.R. 435 -Elmhurst-Single Lane-Bridge Inspection/repairs-Wednesday 08/23/2017-Thursday 08/24/2017-7 a.m. to 2 p.m.

SR 590-S.R. 590-Elmhurst and Madison Twps.-Single Lane-Chip Seal-Monday 08/21/2017-Tuesday 08/22/2017-7 a.m. to 2 p.m.

SR 1002-Ridge Rd-Greenfield-Single-Shoulder Back-up-21-Aug-17-25-Aug-17-7 a.m. to 3 p.m.

SR 1015-Worth Church-Benton Twp.-Single-Shoulder Back-up-21-Aug-17-25-Aug-17-7 a.m. to 3 p.m.

SR 1018-Lane/Erie-Jessup Borough-Single-Fog Seal-21-Aug-17-25-Aug-17-7 a.m. to 3 p.m.

SR 1039-Meredith-Carbondale-Single-Fog Seal-21-Aug-17-25-Aug-17-7 a.m. to 3 p.m.

SR 2002-Wimmers Rd.-Jefferson Twp.-Single Lane-Chip Seal-Tuesday 08/22/2017-Wednesday 08/23/2017-7 a.m. to 2 p.m.

SR 2003-Cortez Rd.-Jefferson Twp.-Single Lane-Chip Seal-Wednesday 08/23/2017-Thursday 08/24/2017-7 a.m. to 2 p.m

SR 4002-Farnham Rd.-East Benton-Road Closed w/ Detour-Bridge Repair/Replacement-Monday 08/21/2017-Friday 08/25/2017-7 a.m. to 2 p.m.

Long Term

SR 6/11 (Lackawanna Trail)- From Clarks Summit to Clinton, traffic will be down to a single lane in both directions due to construction. Crews should be finished with this work in November 2017. The following spring, crews will begin working near Dalton. When that is complete, final pave will take place at night. Starting May 15, 2018, through the middle of June, 2018, crews will be paving form Clarks Summit to Dalton, then Dalton to Wyoming County.   Starting on Wednesday, July 5 from Sr 632(Dalton) to Overlook Rd all traffic will be on the east bond  lane so work could continue on the west bond lane.  This will be continue till Oct 1, 2017.

SR 347 (O’Neill Highway/Blakely Street)- Dunmore Signal Project work is progressing as crews continue to pour concrete sidewalks near the Subway entrance. They are also erecting traffic signal foundations at Rite Aid. In roughly three weeks, crews will start work at the Dunmore Corners section. Traffic will be down to one lane in this area. The entire project is scheduled to be completed by July 2017.

SR 1012, Archbald Borough- At the intersection of Kennedy Drive and County Road, work is taking place to form a four-way intersection with the opposite Borough street. A new traffic signal will be installed at this intersection as well, and Kennedy Drive will be widened to accommodate a center turn lane from Main Street to Monica Drive. An additional left turn lane may be added on Main for left turns on to Kennedy Drive. The project should be completed by December 2017.

SR 3013 - Work is taking place on the bridge located in the 800 block of S. Main Street in Taylor over the PA turnpike. Two 11 ft. lanes will remain open during construction. This should be completed by November.

NOW OPEN SR 4019- Construction work on the Edella Road bridge over I-81 in South Abington Township is taking place as crews form the center pier stem.

SR 4032 (Shady Lane) in South Abington Twp.- There will be work on a section of state highway from approximately 0.09 miles west of SR 11 to approximately 0.17 miles east of SR 307. This project will replace the existing slab on the bridge under the concrete arch associated with the DL&W Railroad with a new slab. MPT during the construction will be a detour. This project is expected to be completed by November.

SR 6011(Harrison Avenue), Scranton - As part of the ongoing project to replace the Harrison Avenue Bridge, the Central Scranton Expressway is a single lane pattern in each direction. This project is expected to be completed in 2018.

SR 315 will closed starting Friday, July 7, 2017 at 6 p.m. to Monday, July 10, 2017 at 6 a.m.  from the Walmart and I-81 on ramp. All access to Walmart and I-81 will available through a detour. 

SR 438 Lackawanna County to your long term construction list. SR 438 is closed over Elm Brook at Hopfer Road for a bridge replacement Project. Road to reopen in November. Detours in place.